Jijirema Secondary School – Oromiya

The Jijirema Secondary School project involved the construction of a 10-block G+0 campus for the Oromiya Educational Bureau. The facilities include modern classrooms, a library, laboratories, administrative offices, and essential campus amenities.

Completed in 26 months, the school was built with a focus on durability and child-friendly design. This project contributes directly to the regional goal of expanding access to high-quality education through resilient and well-equipped infrastructure.

Project Summary:

  • Scope: Construction of 10 G+0 blocks including classrooms, library, laboratory, admin offices, latrines, and café.
  • Duration: 26 months
  • Client: Oromiya Educational Bureau
  • Contact: +251 03-717977

About the Author

Leave a Reply

Your email address will not be published. Required fields are marked *

You may also like these

No Related Post